2009   Once again, the available halls, buildings and space have become too small. KMH plans, builds and moves to “the greenland site” – and all within the space of 12 months. The complete move into the industrial area of Bassum takes place during the Christmas holidays. Customers should not be affected by this move. At the beginning of January it is “business as usual“, and production is running again, just as in previous years, “full steam ahead”. It is a top performance by the staff of KMH.

7-baubesprechung
Construction conference on the greenfield site
  gebaude-neu_01
The new KMH building

2009   Introduction of a conductive coating, having the advantage that the usual earthing, using grounding clips and cables or grounding lugs can be dispensed with.
2009   Expansion of the explosion pressure surge resistance also for 1-1.5 mm pipe segments with clamping ring connections (1 bar).


2010   Development and launch of the KMH vario pipe clamp.
2010   Expansion of the product range to include the TPE rubber cover (= food grade).
2011   Extension of the explosion pressure surge resistance to 10 bar up to DN 250mm.
2011   25 years of success for customers worldwide. KMH celebrates its silver jubilee.
2011   Such a special anniversary much be celebrated accordingly. The new KMH catalogue appears in a new spring outfit. KMH is “green”.

2012   More than 120 employees, agencies in Germany and 45 countries. KMH sets benchmarks.

 